Daily schedule

The daily schedule shows a list of all PPS positions accumulated for a workstation. The affected orders are listed in the upper area on the left, the items contained in the selected order to the right.

The list below gives information about the individual items with their processing status.

 

black font color PPS items that does not have to be planned separately or that are not yet included in the daily schedule, e.g. because they were created later.
grey font color PPS items that are included in the completed daily schedule.
green font color Processed PPS items
red font color PPS item, for which the worker needs support or has reported a problem and stored an “information”.

 

Tagesplan einer Arbeitsstation in der Produktionsplanung
Tagesplan einer Arbeitsstation in der Produktionsplanung

 

Via the icon bar the following functions are available:

 

Save the changes of the daily schedule.
Close the daily schedule view.
For allocation of an employee, when this was determined in the configuration of the workstation.
For the allocation of a value
Open a simple text field ton modify / delete individual information.
These are in particular information, that were entered at the workstation,
e.g. to request support or to explain reasons for non-processing (e.g. missing or damaged material).
Groups individual items for the collected processing independent of other sorting criteria and possible cutting optimization.
Calculates the optimal cut for all items included in the daily schedule and groups the items according to their consumption of a full length.
Closes the daily schedule and releases it for processing (if required in the workstation configuration).
Prints assigned reports, such as repeated printing of labels and measurement sheets.

 

Allocation of an employee

In the capacity planning / resource planning, the attendances and responsibilities or possible uses of the employees can be planned. In addition to assigning a standard group, the qualification levels (percentages) of the employees can be stored for each individual work station / group.

If the link to capacity planning is set in the workstation configuration of production planning, all employees who have been assigned to the work group or are qualified for it are displayed when the employees are assigned to the individual work steps of the daily plan.

 

Mitarbeiterzuweisung in der Produktionsplanung
Mitarbeiterzuweisung in der Produktionsplanung

 